The Affordable Natural House under construction -- photo on 6 Sep 2003
The front yard is cleared and all the sand and other plastering materials are up on the porch platform. This weekend we installed recycled porous paving blocks for the driveway. Slabs of concrete -- the original front walk -- which we salvaged back in 2001 are placed as 'runners' under the vehicle tires. We'll try to spread the topsoil in the paving blocks and front yard before October 4th; we're preparing for Wisconsin Solar Tour...
|